TRWC, along with our partner, Tahoe Donner Association is releasing a Request for Bids for implementation of the Euer Valley Restoration, Phase 2 project.
The purpose of the Euer Valley, Phase 2 project is to restore stream and meadow habitat while providing for sustainable recreational access. Implementation activities include construction of instream log jams, channel fill and realignment, log cribwalls, stream access points, and revegetation along with other activities. Project work will take place across two years, with 2026 construction running from mid-August through the end of September. Work in 2027 is anticipated to start approximately August 1 and run through September 30.
A mandatory pre-bid meeting will take place on June 3, 2026 and bids are due June 25, 2026. Additional information can be found below:
- Request for Bids: Euer Valley Restoration, Phase 2
- Attachment 1 – Project Location Map
- Attachment 2 – Euer Valley Phase 2 Engineering Designs
- Attachment 3 – Euer Valley Phase 2 Design Basis Report
- Attachment 4 – Prosser Watershed Assessment
- Attachment 5 – Bid Sheet
- Attachment 6 – Project Permits
- 401 Water Quality Certification
- 1600 Streambed Alteration Agreement
- Nationwide 27 Authorization
For more information, contact Beth Christman at bchristman@truckeeriverwc.org or 530.550.8760 x1.